WaveLine: 6m S-Curve
- Curved Tension-Fabric Backdrop
- Size: 6mW x 2.26mH
- Product Code: #WLM73S
The WaveLine S-Curve Tension-Fabric Backdrop l is a great alternative to standard pop-up displays.
Lightweight aluminium poles with bungee cord snap together to create the framework, then slide on the pillow case-style graphic and zip it closed at the bottom.
The zipper is hidden from view and tightens up the fabric for a smooth, seamless image.
You can choose between a single-sided and a double-sided graphic panel
Ships in a large nylon bag with a hard plastic Case-to-Table Conversion Kit an optional extra.
Kit Includes
- (1) 7×3 S-Curve Frame – 32mm cold-drawn anodized aluminium
- (4) LED L4000 Spotlights with C-Clamps
- (1) Large Nylon Carry Bags, 782mmL x 432mmW x 279mmH
- (1) Fabric Graphic Print – recyclable polyester stretch fabric, vibrant, wrinkle-resistant
- Single-sided: choose white (standard) or black fabric for second side
- Double-sided: optional extra
Optional Extras
- Double-Sided Fabric Graphic
Specifications
- Display Size: 6mW x 2.26mH
- Shipping Size: 1 x Large Nylon Carry Bags, 782mmL x 432mmW x 279mmH
- Graphic Material: Dye-sublimation Stretch Fabric
- Warranty: Lifetime on Hardware. One (1) year on Graphic.
Request A Quote
You have not viewed any product yet.













